Hiring a grab lorry - instead of a skip
Contents |
[edit] Introduction
Whether for a construction company, commercial business, or a homeowner; skip hire is often the most common choice when it comes to the disposing of waste from a project. This article looks at reasons hiring a grab lorry may be a more beneficial choice.
[edit] Permits and space
When hiring a skip, the local council may require a permit depending on where it will be located. Although these permits are often approved, they call for a lot of organisation and planning in advance – as well as the additional cost.
To use a grab lorry however, no permit is required. Grab lorries will arrive at a specified time to collect all the waste, before transporting it to the closest tip or landfill used by the company.
In addition, grab hire lorries do not need to park in a driveway or block a public road; allowing for a quick and easy solution.
[edit] Easy access
Grab lorries are designed to collect all waste in one go. It’s unique grab function can easily reach rubbish in awkward places, no matter how heavy or where it is placed.
Most grab lorries collect any type of waste from 2 to 15 cubic yards.
[edit] Cost efficiency
On average, a pick up by a grab lorry takes 20 minutes; a significant difference to the days it takes to use a skip.
Grab lorries will remove all waste from a site, no matter how many trips need to be made, ensuring that all waste is disposed of. Mixed loads are also collected, meaning that organising and separating waste may be unnecessary.
With no need for a permit and at cheaper rates than a skip, grab hire lorries can be a cost effective and efficient solution.
https://www.pbdonoghue.com/services/grab-hire/198/
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.




















Comments
Great Information. Grab hire lorries are perfectly designed to be able to remove large amounts of construction, business, and garden waste. Oftentimes projects will require a lot of work and will generate a lot of waste, and this needs to be dealt with swiftly and succinctly.